Subgrade Stabilization & Base Installation Services

LIGHTNING PERFORMS ALL EXCAVATION, GRADING, SCARIFYING, MIXING VIA RECLAIMER/RECYCLER, WATERING, AND COMPACTION ASSOCIATED WITH CEMENT STABILIZATION OF SUBGRADES AND CEMENT TREATMENT OF BASE.
OUR CEMENT IS SUPPLIED DIRECTLY AND DELIVERED FROM THE PORT OF HOUSTON, AND WE OWN ALL EQUIPMENT REQUIRED FOR PROFESSIONAL INSTALLATION.  
CEMENT STABILIZATION IS TYPICALLY THE FOUNDATION OF ANY OF OUR HEAVY DUTY PAVING PROJECTS, THEREFORE, WE ARE WELL PRACTICED AND PROFICIENTLY PERFORM.
Cement Stabilization Options Available:
Dry Powered Portland Cement Type I & II Delivered via Tankers with derated/depressurized spray rails (~20 TN/TL) or Super Sacks, 4,409 LB/SK (11 SK/TL, 48,499 LB/TL)
% Cement Depth LB/SY
4% 6" 21 LB/SY
6% 6" 31.5 LB/SY
8% 6" 42 LB/SY
10% 6" 52.5 LB/SY
4% 12" 42 LB/SY
6% 12" 63 LB/SY
8% 12" 84 LB/SY
10% 12" 105 LB/SY


 




HomeAdvisor Screened & Approved